Pick and Run + Live Unload
In the drayage industry, Pick and Run + Live Unload involves the driver pickling up a entertainer or trailer and transporting it directly to the destination, where the cargo is unloaded immediately upon arrival, minimizing transmit time but requiring the driver to wait during the unloading process.
Pick and Run + Live Unload routing template contains Move 1, including Pickup Container, Delivery Container and Drop Container.
This article provides the guidance on how to complete the load process with this routing template.
Dispatch Load on Web
This section provides the structure on how to edit the load information and arrange driver assignment.
- Navigate to Dispatcher > Dispatcher List, confirm the target load and click Load # into details page. It supports quick searching via Load #.
- Keep on Info Tab, update the Vessel ETA, Last Free Day and Discharged Date. More field details, please refer to this article (opens in a new tab).
- Click Routing tab, confirm the Routing Template then to select a driver to execute Move 1.
Accept and Execute the Task on App
This section introduces the driver operations on app.
- Go to Home > Upcoming, it display all assigned loads in this interface.
- Select the target task, tap the task, tap Accept Load button to accept it. Otherwise, tap Reject button. Tap YES to continue.
- Go to Active tab, it display all accepted loads in this page.
- Start the first event: Pickup Container. When you arrived the pickup location, please tap the Arrived Button to update the status. Tap CONFIRM to process.
- Tap Departed when you drive to next location.
- Continue second event: Delivery Container. Tap Arrived to update the status if you arrived in delivery destination.
- Tap Sign to complete the Electronic Signature and record the date and time. Tap Apply button to save and apply the data, then tap Done button to process.
- Tap Departed when you leave this location and drive to the next location.
- Execute the final event: Drop Container, please tap Arrived button to update the status when you arrive the location.
Complete Load on Web
After all Move has finished, the dispatcher should confirm the progress and complete the load on web.
- Go to Dispatcher > Dispatcher List, click Load # to access details page of the target load.
- Go to Routing tab, click Complete Load button if the process doesn’t exist any issue. The load status will automatically updated in real time during the process.